AL MASANE AL KOBRA MINING COMPANY P-1000 UNIT, 1000 PE, 200 m3/day NAJRAN / SAUDI ARABIA - 2018
ANAGOLD MADENCİLİK SAN. VE TİC. A.Ş. P-800 UNIT, 800 PE, 160 m3/day ERZINCAN / TÜRKİYE - 2018
ÖMERLİPARK VİLLALARI P-100 UNIT, 100 PE, 20 m3/day İSTANBUL / TURKEY - 2018
ZEBERCAD GROUP K-300 UNIT, 300 PE, 60 m3/day NIGERIA - 2018
METRO/BODRUM/SHOPPING CENTER P-500 UNIT, 500 PE, 100 m3/day MUĞLA / TÜRKİYE - 2017
KAYA PALAZZO HOTEL K-3000 UNIT, 3000 PE, 600 m3/day GİRNE/ KKTC - 2017
YAKINDOĞU UNIVERSITY K-10000 UNIT, 10000 PE, 2000 m3/day GİRNE/ KKTC - 2017
DINARSU FACTORY WWTP 3500 m3/day ALAPLI-ZONGULDAK / TÜRKİYE - 2017
SİYAHKALEM ZEKERİYAKÖY PROJECT K-5000 UNIT, 5000 PE, 1000 m3/day İSTANBUL / TÜRKİYE - 2016
SİYAHKALEM AFAD PROJECT P-300 UNIT, 300 PE, 60 m3/day İSTANBUL / TURKEY - 2017
BRISA BRIDGESTONE SABANCI P-750 UNIT, 750 PE, 150 m3/day AKSARAY / TÜRKİYE - 2016
SELAHI ICTEM HOUSING PROJECT K-50 UNIT, 50 PE, 10 m3/day MUĞLA / TÜRKİYE - 2016
ENKA BAGHDAD ELECTRICAL POWER STATION – BESMAYA PROJECT P-150 UNIT, 30 m3/day BAGHDAD / IRAQ - 2016
ANKARA ANADOLU OSB P UNIT, 150 m3/day ANKARA / TÜRKİYE - 2016
S.S. İLDENİZKENT SİTESİ P-500 UNIT, 500 PE, 100 m3/day ARMUTLU, YALOVA - 2015
ENKA BAZYAN CCPP PROJECT P-50 UNIT, 50 PE, 10 m3/day SULAYMANIYAH / IRAQ, 2015
S.S. ÇAYBOYU KOOPERATİFİ K-200 UNIT, 200 PE, 40 m3/day MUĞLA / TÜRKİYE - 2015
ANKARA ANADOLU OSB P-500 UNIT, 500 PE, 100 m3/day ANKARA / TÜRKİYE - 2015
SAMSUNG KIRIKKALE POWER PLANT P-1000 UNIT; 1000 PE; 200 m³/day KIRIKKALE / TÜRKİYE - 2015
KAYA HOLDİNG/ SERAP SU ŞİŞELEME P-100 UNIT, 100 PE, 20 m3/day KOCAELI / TURKEY- 2015
KURD.GATE / GULAN PARK TOWER 2xK-1000 UNIT; 2000 PE; 400 m³/day ERBIL / IRAQ-2015
BEGONVIL EVLERI K-300 UNIT, 300 PE, 60 m3/day MUGLA / TURKEY-2015
TSO MÜHENDİSLİK P-300 UNIT; 300 PE; 60 m³/day DAHOK / IRAQ-2014
ANAGOLD MADENCİLİK SAN. 2xP800 UNIT, 1600 PE, 320 m3/day ERZINCAN/ TURKEY-2014
ABDI IBRAHIM GLOBAL PHARM BIOMEMBRAN 100 UNIT; 20 m³/day ALMATY/ KAZAKHSTAN-2014
FABAL ALÜMİNYUM P-400 UNIT, 400 PE, 80 m3/day TEKIRDAG/ TURKEY-2014
ENKA TEKNİK / SÜLAYMANİYAH P-50 UNIT, 50 PE, 10 m3/day SULEYMANIYAH/ IRAQ-2014
SAĞLIK VE EĞİTİM VAKFI WATER TREATMENT SYSTEM, 10 m3/day ISTANBUL/ TURKEY-2014
ENKA TEKNİK / ERBİL PROJESİ P-50 ÜNİTESİ, 50 NE, 10 m3/gün ERBIL / IRAQ- 2014
FUGA YAZ EVLERİ K-300 UNIT FIXING WORKS, 300 PE, 60 m3/day MUGLA / TURKEY -2014
AZFEN COP CW PROJESİ 3XP500 UNIT, 1500 PE, 300 m3/day BAKU/ AZERBYJAN 2014
BURAY İNŞAAT K-300 UNIT, 300 PE, 60 m3/day MUGLA / TURKEY-2014
THOR HOTEL K-100 UNIT, 100 NE, 20 m3/day MUĞLA / TURKEY - 2014
KÖMÜRCÜLER ORG. IND. ZONE BIOMEMBRAN 1000 UNIT; 200 m³/day KOCAELİ / TURKEY - 2014
BEST MODE TEKSTİL P-600 UNIT, 600 PE, 120 m3/day ISTANBUL/ TURKEY-2014
KIRMIZI DEĞİRMEN SİTESİ K-600 UNIT, 600 PE, 120 m3/day BODRUM / TURKEY -2014
ÖZGÜR SAHİL SİTESİ K-600 UNIT, 600 PE, 120 m3/day BODRUM / TURKEY -2014
POLEN UN VE GIDA A.Ş. BIOMEMBRAN UNIT; 45 m³/day ISTANBUL / TURKEY-2014
ENKA TEKNİK A.Ş. / NAJYBIA PROJ. BIOMEMBRAN 400 UNIT; 75 m³/day IRAQ - 2014
MONARCH COURT HEBİL EVLERİ K-200 UNIT, 200 PE, 40 m3/day BODRUM / TURKEY -2013
'STE'' LİMİTED ŞİRKETİ / P-1000 UNIT, 1400 PE, 210 m3/day KAZAKHYSTAN- 2013
ENKA INS/ WEST QURNA PROJECT P-100 UNIT, 100 PE, 20 m3/day BASRAH / IRAQ- 2013
ANADOLU MOTOR A.Ş. K 400 UNIT, 400 PE, 80 m3/day KOCAELİ / TURKEY- 2013
CEYTUN İNŞAAT SAN. VE TİC. A.Ş. P-400 UNIT, 400 PE, 80 m3/day AFGANISTAN-2013
NİLTAŞ İNŞ.- YAPRAK VİLLALARI K-50 UNIT, 50 PE, 10 m3/day BODRUM / TURKEY -2013
PROMİS ENERJİ-BOTAŞ TUZ GÖLÜ P-100 UNIT, 100 PE, 20 m3/day AKSARAY / TURKEY -2013
ENKA TEKNİK A.Ş. / OBARI PROJ. P-500 UNIT; 500 PE; 100 m³/day LIBIA - 2013
EMERALD I-II SİTESİ P-200 UNIT, 200 PE, 40 m3/day BODRUM / TURKEY -2013
YAPKİM YAPI KİMYA SANAYİ A.Ş. P-100 UNIT; 100 PE; 20 m³/day KOCAELI / TURKEY- 2013
MERCEDES-BENZ TÜRK A.Ş. BIOMASS-P UNIT, 200 m3/day ISTANBUL / TURKEY- 2013
S.S. BODRUM ONURKENT KOPERATİFİ 2xK-500 UNIT; 1000 NE; 200 m³/day BODRUM / TURKEY -2013
OBASAN GIDA BIOMEMBRAN UNIT, 150 m3/day KOCAELİ / TURKEY- 2013
SİYAH KALEM P-1000 UNIT; 1000 PE; 200 m³/day SOMALI - 2013
BESTAR TARIM VE HAYVANCILIK BIO.WASTEWATER TREATMENT UNIT ;300 m³/day KIRKLARELI / TURKEY -2013
S.S. BODRUM ONURKENT K-700 UNIT; 700 PE; 140 m³/day BODRUM / TURKEY -2013
ENKA TEKNİK A.Ş. P-750 UNIT; 750 PE; 150 m³/day IRAQ
ÖZDEMİR İNŞ. - BOTAŞ KOMPRESÖR P-150 UNIT; 100 PE; 30 m³/day ERZINCAN / TURKEY- 2013
TÜRKERLER İNŞ.- BOTAŞ CS-3 P-100 UNIT; 100 PE; 20 m³/day KIRSEHIR / TURKEY- 2012
TOSÇELİK PROFİL VE SAÇ A.Ş. P-500 UNIT; 500 PE; 100 m³/day ALGARIA - 2013
TOSÇELİK PROFİL VE SAÇ A.Ş. P-150 UNIT; 150 PE; 30 m³/day ALGARIA - 2013
ELMAS KENT SİTESİ YÖNETİMİ K-300 ÜNİTESİ; 300 PE; 60 m³/day BODRUM / TURKEY -2012
BOZBAĞ EVLERİ P-50 UNIT; 50 PE; 10 m³/day ISTANBUL / TURKEY -2012
ÇAĞDAŞ ÇORAPÇILIK P-1000 UNIT; 1000 PE; 200 m³/day ISTANBUL / TURKEY -2012
SENTEZ AMBALAJ P-1000 UNIT; 1000 PE; 200 m³/day KOCAELI / TURKEY- 2012
DEKOR İÇ VE DIŞ TİC.LTD.ŞTİ. K-500 UNIT; 500 PE; 100 m³/day KOCAELI / TURKEY- 2012
ADALI HOLDİNG/ SERKA TAAHHÜT P-50 UNIT; 50 PE; 10 m³/day MANAS/ KRGYZSTAN-2012
SİMETRİ TESİSAT P-50 UNIT; 50 PE; 10 m³/day ERZINCAN / TURKEY -2012
SELAH MAKİNA K-200 UNIT; 200 NE; 40 m³/day BODRUM / TURKEY- 2012
MAYA TEKSTİL P-1000 UNIT; 1000 PE; 200 m³/day SAKARYA / TURKEY- 2011
MUĞLA ÖĞRENCİ YURDU_ALİ EFE P-50 UNIT; 50 PE; 10 m³/day MUĞLA / TURKEY- 2011
DORUKKAYA TURİZM 2 PCS OF K-1000 UNIT; 2000 PE; 400 m³/day BOLU / TURKEY- 2011
BAYTEK MEKANİK ÇÖP TRANS. İST. 2 PCS OF P-200 UNIT; 400 PE; 80 m³/day MERSİN / TURKEY- 2011
AKÇANSA ÇİMENTO SAN. TİC. A.Ş. CHEMICAL + P-200 UNIT; 200 PE; 40 m³/day SAMSUN / TURKEY- 2011
SHELL & TURCAS AMBARLI DOLUM P-50 UNIT; 50 PE; 10 m³/day ISTANBUL / TURKEY -2011
ANAGOLD MADENCİLİK SAN.TİC.A.Ş. SECOND P-400 UNIT; 400 PE; 80 m³/day ERZINCAN / TURKEY -2011
MAUSER AMBALAJ P-100 UNIT; 100 PE; 20 m³/day KOCAELI / TURKEY- 2011
KUZEY İNŞAAT P-300 UNIT; 300 PE; 60 m³/day KOCAELI / TURKEY- 2011
AIKON CPIT P-50 UNIT; 50 PE; 10 m³/day BAKU/ AZERBAYCAN -2011
ÇAMLIK EVLER SİTESİ P-100 UNIT; 100 PE; 20 m³/day ISTANBUL / TURKEY -2011
CAGS TOBACCO SAN.TİC.A.Ş. P-500 UNIT; 500 PE; 100 m³/day ISTANBUL / TURKEY -2011
ANAGOLD MADENCİLİK SAN.TİC.A.Ş. P-400 UNIT; 400 PE; 80 m³/day ERZINCAN / TURKEY -2011
KULAK İNŞAAT P-1000 UNIT; 1000 PE; 200 m³/day ADANA / TURKEY- 2011
GÜZELLER ORGANİZE SAN.BÖLG. R-10000 UNIT; 10000 PE; 2000 m³/day KOCAELI / TURKEY- 2011
MİO BİANCO HOTEL P-300 UNIT; 300 PE; 60 m³/day MUGLA / TURKEY -2011
ALTIN ÇİNİ VE SERAMİK A.Ş. K-200 UNIT; 200 PE; 40 m³/day KUTAHYA / TURKEY -2010
MERCEDES BENZTÜRK A.Ş. 2 PCS OF P-1000 UNITS; 210 m³/day ISTANBUL / TURKEY -2010
KORAY İNŞAAT SAN.TİC.A.Ş. K-50 UNIT; 50 PE; 10 m³/day BALIKESIR / TURKEY-2010
ÖZEL ALEV OKULLARI P-1000 UNIT; 1000 PE; 200 m³/day ISTANBUL / TURKEY -2010
BARCO TEKSTİL SAN.TİC.A.Ş. K-300 UNIT; 300 PE; 60 m³/day ISTANBUL / TURKEY -2010
POLİMEKS İNŞAAT A.Ş. 3 PCS OF R-5000 UNIT; 15000 PE; 3000 m³/day TURKMENISTAN - 2010
YAPI KREDİ BANKASI A.Ş. 2 PCS OF P-800 UNIT; 1600 PE; 320 m³/day GEBZE / TURKEY - 2010
KARADENİZ EREĞLİ O.S.B. P-1000 UNIT; 1000 PE; 200 m³/day ZONGULDAK/TURKEY -2010
ÇİMTAŞ ÇELİK İML. MON. TES. A.Ş. P-500 UNIT; 500 PE; 100 m³/day BURSA / TURKEY - 2010
AAS-ATE JOINT VENTURE LTD P-500 UNIT; 500 PE; 100 m³/day BAKU/AZERBAYCAN - 2010
ÖZEL PİRİ REİS İLK ÖĞRETİM KOLEJİ K-400 UNIT; 400 PE; 80 m³/day MUĞLA / TURKEY- 2010
ENKA TEKNİK OKULLARI P-300 UNIT; 300 PE; 60 m³/day GEBZE / TURKEY - 2010
ÇUKURDERE MADENCİLİK P-200 UNIT; 200 PE; 40 m³/day ERZİNCAN / TURKEY-2010
ÇEÇEN İNŞAAT VE ENERJİ SİST. A.Ş. P-100 UNIT; 100 PE; 20 m³/day GOSB - GEBZE - 2010
KALEMCİ YAPI END. VE TİC. A.Ş. P-50 UNIT; 50 PE; 10 m³/day BALIKESİR / TURKEY - 2010
EPA MİMARLIK K-50 UNIT; 50 PE; 10 m³/day AYVALIK / TURKEY-2010
KALEMCİ YAPI END. VE TİC. A.Ş. P-200 UNIT; 200 PE; 40 m³/day BALIKESİR / TURKEY - 2008

 

MASS ARITMA SISTEMLERI INSAAT SANAYI ve TICARET A.S.
Altaycesme Mahallesi Camli Sokak No: 21, 34843 Maltepe, Istanbul - Turkey
Phone: +90 (216) 301 1140 pbx
Fax: +90 (216) 301 1144
E-mail: info@massaritma.com